
Legrand
CX Energy Management System
- The purpose of the CX³ energy management system (EMS) is to supervise and manage a building's energy consumption, ensuring reliability and continuity of service, for optimum installation efficiency.
- Genuine manufacturer equipment
- Technical support from our engineers
Product details
- The purpose of Legrand’s CX³ EMS is to supervise and manage a building’s energy consumption, ensuring reliability and continuity of service, for optimum installation efficiency.
- Because it offers the option of viewing, measuring and controlling an installation remotely and/or locally, CX³ EMS can be used to monitor all activity, use energy precisely, and improve installation operation by anticipating any potential faults.
A complete, compact system
- CX³ EMS has compact dimensions in order to optimise space in the distribution board plus all the functions needed for complete supervision of the installation: metering, status feedback (ON/OFF/fault), control, pulse metering, serial communication, display.
- The CX³ EMS system does not require a minimum number of modules. Thanks to its scalability, new functions can be added at any time to suit the needs of the installation.
Simplicity & adaptability
- With only 14 types of function module, you can supervise all types of installation, whether new or existing.
- CX³ EMS modules are optimised for installation on a DIN rail in conjunction with DX³ MCBs, but they can also manage MCCBs or ACBs, such as DPX³ and DMX³.
Local or remote management
There are two possible options for configuring the CX³ EMS and viewing the information it provides:
- Locally, in the distribution board, thanks to a mini-configurator
- Remotely via a computer, tablet or smartphone, thanks to Legrand’s Energy Web Server
More in Electrical Energy Metering
View all
LegrandEMDX³ energy meters
Their role is to record the electricity consumed by a single-phase or three-phase circuit downstream of the electricity supply company's metering
LegrandModular units
These are used to measure current, voltage, active, reactive and apparent power as well as internal temperature.
LegrandEMDX³ Access units
These are used to measure current, voltage, active, reactive and apparent power, internal temperature and the power factor.
LegrandEMDX³ Premium unit
This has the same characteristics as the EDMX³ Access unit as well as individual harmonics up to order 63, alarm programming and memory of up to 8 MB.